You are here:

Value Engineering

At GreyFrame our overarching theme is that “there must be a better way”. In this regard, we have structured the business in a way that at all stages of project delivery there is value engineering, constantly looking for improvement from initial design to installation.
Assessing a building design and construction program in detail to identify areas a GreyFrame solution can bring maximum value. Our design, management and manufacturing teams, using BIM and CNC technologies can deliver innovative improvements across your project;

  • Fixed price cost certainty
  • Faster build times with modular components designed to connect
  • Reduction in preliminary site costs
  • Less waste on-site and in manufacture
  • Reduced site storage with Just-in-time logistics
  • Reduced time on site requiring less ancillary costs
  • Reduction in site labour requirements